Maximize energy output, reduce maintenance cost, and benefit from predictable expenses over the life of your PV power plant assets with Trivector Power Solutions comprehensive suite of O&M solutions.
A | FACILITES REPORTING AND MONIORING |
A.1 | MONITORING OF THE PLANT |
A.2 | PREPERATION OF DAILY REPORTS |
A.3 | CALCULATION OF PERFORMANCE RATION AND AVAILABELITY OF PLANT |
A.4 | COORDINATION WITH GRID TEAM FOR GRID AVAILABELITY |
A.5 | REGISTERIATION OF DAILY ACTIVITEIS |
A.6 | INFORMATION OF INCIDENCE |
A.7 | PREPERATION OF INCIDENCE REPROT |
A.8 | PREPERATION OF EXTIMATION FOR REPAIRING OF LOOSE OF FOR INSURANCE |
A.9 | DAILY,WEEKLY,MONTHLY TECHNICAL REPORTS |
B. | FACILITIES PREVENTIVE MAINTENANCE |
B.1 | PREVENTIVE MAINTENANCE |
B.2 | DAILY VISUAL INSPECTION OF EQUIPMENTS INSTALLED IN PLANT |
B.3 | DAILY VISUAL INSPECTION OF PV STRUCTURE AND PV MODULES |
B.4 | DAILY INSPECTION OF FIRE FIGHTING EQUIPMENTS |
B.5 | STRING CURRENT MEASURMENT AT SMB LEVEL |
B.6 | DAILY VISUAL INSPECTION OF CIVIL INFRASTRUCTURE |
B.7 | PM OF INVERTER , HT ,LT PANELS, Metering Panel, ACCB, FIRE FIGHTING EQUIPS AND OTHER EQUIPS |
B.8 | PREPERATION OF REPORTS AND REPORT FOR CORRECTIVE WORKS |
B.9 | PV PANEL CLEANING (TWICE/MONTH) |
B.10 | SUPPLY OF WATER FOR CLEANING |
B.11 | SUPPLY OF MANPOWER FOR CLEANING |
B.12 | TOOLS AND TACKLES |
B.13 | CONSUMABLE ITEMS REQUIRED IN DAILY AND PREVENTIVE WORKS |
C | CORRECTIVE MAINTENANCE IN PV |
C.1 | MAJOUR FUNCTION FAILURE |
C.2 | FAILURE OF DC BREAKER , AC BREAKER MACHANISM & IGBT IN INVERTER |
D | REPORTING AND MANAGEMENT OF CORRECTIVE WORKS |
D.1 | REPORTING FOR BREAKDOWN OF EQUIPMENTS |
D.2 | PLANNING FOR CORRECTIVE WORKS |
D.3 | REPORTING IF ANY HEAVY MECHIONERY REQUIRED FOR CORRECTIVE WORK |
D.4 | PROVIDING EXTRA RECOURCES FOR CORRECTIVE WORKS |
D.5 | TOOLS REQUIRED FOR CORRECTIVE WORKS |
D.6 | CORRECTION AND MAKING SYSTEM IN GOOD CONDITION |
E | FACILITIES PREDICTIVE MAINTENANCE |
E.1 | PREDICTIVE MAINTEANC OF EQUIPMENTS |
E.2 | EXTRA LABORATORY WORKS PV MODULES ESSEYS |
E.3 | PLANNING FOR PREDICTIVE WORKS |
E.4 | THERMOGRAOGY INSPECTION OF PV PANELS & ALL ELECTRICAL BOARD |
E.5 | I-V CURVE TEST AT STRING LEVEL |
E.6 | SHUTDOWN APPLICATION FOR CARRYING OUT PREDICTIVE WORKS |
F | CONSUMABLES PARTS MANAGEMENT |
F.1 | CONSUMABLE ITEMS ( CONDITIONAL) AND PROCOURMENT |
G | SPARE PART MANAGEMENT |
G.1 | PREPERATION OF SPARE PARTS LIST |
G.2 | MANAGEMENT OF SPARE PARTS |
G.3 | WARE HOUSING OF SPARE PARTS |